J Ask Jack — Tool Finder ›
Full Calculators Directory Index ›
Concrete & Masonry
Roofing & Framing
Stairs & Railings
Metalwork & Fabrication
Woodworking & Design
Interior & Finishing
Electrical, HVAC & Solar
Structural & Safety
Landscape & Site
Planning & Contracts
Metric Units

Sources & Governing Codes

  1. IBC 2021 Section 1011 Means of Egress & Occupant Load: IBC 2021 Section 1011 Means of Egress & Occupant Load View Standard
  2. OSHA Standard 1926 Construction Safety Regulations: OSHA Standard 1926 Construction Safety Regulations View Standard
  3. ADA 2010 Standards for Accessible Design: ADA 2010 Standards for Accessible Design View Standard

Frequently Asked Questions (FAQ)

What is an Interim Payment Certificate (IPC)?

An Interim Payment Certificate (IPC) is a formal document issued by the supervising engineer or project manager certifying the net amount due to the contractor for work executed during a specific billing period, after deducting retention, advance payment recoveries, and previous payments.

What is the AIA G702 / G703 form?

In the United States, AIA Document G702 (Application and Certificate for Payment) and G703 (Continuation Sheet / Schedule of Values) are standard administrative forms published by the American Institute of Architects for contractors to submit progress billings.

How is advance payment recovered in an IPC?

Under FIDIC Sub-Clause 14.2, an advance mobilization payment is amortized through percentage deductions (typically 10% to 20%) applied to the gross value of each certified IPC once cumulative progress reaches a contractually specified threshold.

Why are materials stored on site included in progress billings?

Contracts often allow contractors to bill for un-fixed materials delivered to the jobsite (with proof of ownership and insurance) to assist contractor cashflow for long-lead structural items like rebar, structural steel, or mechanical plant.

When is an IPC due for payment under FIDIC Sub-Clause 14.7?

Under FIDIC Red Book Sub-Clause 14.7, the employer must pay the certified IPC amount within 56 days after the engineer receives the contractor's statement and supporting documents, unless otherwise agreed.

What is a Schedule of Values (SOV)?

A Schedule of Values is a detailed cost breakdown of the total contract price allocated across specific trade work items, serving as the baseline for evaluating percentage completion on monthly payment applications.

How does retention interact with progress payment certification?

Retention is deducted directly from the gross value of certified work on each progress payment application until the cumulative retention cap is reached, reducing the immediate net payment to the contractor.

What happens if an interim payment certificate is under-certified?

If the engineer or architect reduces the requested amount, the contractor can submit additional documentation or dispute the deduction. FIDIC Sub-Clause 14.6 allows the engineer to correct any previous certificate in subsequent IPCs.