Preliminaries & General (P&G) Calculator

Calculate time-related site management costs, fixed setup fees, percentage of works ratio, and delay prolongation claims under CSI Division 01 and FIDIC rules.

P&G Cost Inputs

P&G Cost Dashboard

P&G = 20.5% of Works
Total Preliminaries & General Cost
$410,000
EOT Prolongation Claim: $60,000 (for 2 mo delay)
Time-Related P&G Total: $360,000
Fixed / One-Off P&G Total: $50,000
P&G % of Works Cost: 20.5%
Effective Monthly P&G Cost: $34,167/month

Time-Related vs Fixed P&G Monthly Distribution

Frequently Asked Questions (FAQ)

What are Preliminaries and General Conditions (P&G)?

P&G (or General Conditions under CSI Division 01) represent site overheads, project management, temporary offices, site security, utilities, and insurances required to execute construction works.

What is the difference between time-related and fixed P&G?

Time-related P&G costs scale directly with project duration (monthly staff salaries, crane rental, office utilities). Fixed P&G costs occur once during mobilization or demobilization.

What is a typical P&G percentage of works cost?

Preliminaries typically range from 8% to 25% of direct works cost depending on project complexity, location, duration, and safety requirements.

How is prolongation cost calculated during an EOT delay?

Prolongation cost = monthly time-related P&G rate × approved Extension of Time (EOT) delay months. For example, $30,000/month × 2 months EOT = $60,000 prolongation claim.

What is CSI MasterFormat Division 01?

CSI MasterFormat Division 01 specifies General Requirements including administrative procedures, temporary facilities, quality control, and execution requirements.

How do P&G costs relate to FIDIC BOQ Preliminaries?

FIDIC Bill of Quantities (BOQ) includes a dedicated Preliminaries section for pricing site overheads separately from permanent work item unit rates.

Are fixed P&G costs recoverable during delay prolongation claims?

No. Fixed mobilization and demobilization costs are incurred regardless of project duration, so only time-related P&G expenses are compensable during delay extensions.

How does P&G tracking interlink with Liquidated Damages and EOT?

If contractor delay occurs, the employer levies Liquidated Damages; if owner delay occurs, the contractor claims EOT time relief plus P&G prolongation compensation.

What are Preliminaries & General (P&G) costs in construction contracts?

P&G costs are jobsite management and site operational overhead costs required to run a project that cannot be allocated directly to a specific permanent work item.

What is the typical percentage range of P&G relative to total contract value?

P&G costs typically range from 8% to 15% of total contract value depending on project duration, complexity, site logistics, and regional market norms.

What items fall under Fixed Preliminaries vs Time-Related Preliminaries?

Fixed preliminaries are one-off setup costs (mobilization, hoardings, temporary utility connection). Time-related preliminaries scale with duration (site office rental, staff salaries, welfare facilities, security).

How are project management salaries allocated in P&G schedules?

Monthly salaries for project managers, site engineers, QS, safety officers, and foremen are extended over the baseline construction duration as time-related preliminary items.

What temporary utilities are included in site preliminaries?

Temporary power transformers, site lighting, water distribution, internet, and temporary site drainage setup and monthly utility bills.

How does an extension of time (EOT) impact time-related preliminary costs?

An approved compensable EOT entitles the contractor to claim prolonged time-related preliminaries for the extended duration.

What is the difference between Preliminaries and Main Office Overhead (Head Office Overhead)?

Preliminaries cover site-specific indirect operational costs, whereas head office overhead covers corporate administration, executive salaries, and offsite office rent.

How are contractor insurance policies budgeted in preliminaries?

Contractor's All Risks (CAR) insurance, Third-Party Liability (TPL), and Workmen's Compensation premiums are included as fixed preliminary cost line items.

What site security and safety provisions are estimated in P&G?

Perimeter fencing, security guard shifts, CCTV surveillance, PPE inventory, site signage, and first aid facility maintenance.

How does FIDIC Clause 13 handle variations to general preliminaries?

Under FIDIC conditions, if variation orders substantially increase project scope or duration, time-related preliminaries are adjusted pro-rata or by actual proven cost records.

Sources & Governing Codes

  1. Wikipedia Bill of Quantities & Preliminaries Specification: Wikipedia Bill of Quantities & Preliminaries Specification View Standard
  2. Wikipedia General Contractor Site Overhead & Management: Wikipedia General Contractor Site Overhead & Management View Standard